LEVEL CROSSING CLOSING FOR MAINTENANCE WORK

0
521

There will be a temporary road closure of the Black Bridge Pont Loerig Level Crossing from a point 170metres north of its junction with the TR A40 for a distance of 70metres overnight on Wednesday October, 28.

Centurion Traffic Management are carrying out engineering, maintenance and inspection works to the level crossing from 10pm on Wednesday, October 28, until 5.30am the following morning.

Alternative routes will be signposted. North bound traffic will need to travel in a southerly direction along the U6206 to its junction with the TR A40.  There they will need to turn left and continue in an easterly direction along the TR A40 to its junction with Black Bridge Roundabout.  At that roundabout, take the second exit and continue in an easterly direction to its junction with the C3204.  At the junction, turn left and continue in a north-westerly direction to its junction with the U6206.  At this junction, turn left and continue in a south-westerly to south-easterly direction to return to a point north of the closure.  Vice Versa for south bound traffic.

The Black Bridge Pont Loerig Level Crossing, from a point 170metres north of its junction with the TR A40 for a distance of 70metres on Thursday October 29.


Help keep news FREE for our readers

Supporting your local community newspaper/online news outlet is crucial now more than ever. If you believe in independent journalism, then consider making a valuable contribution by making a one-time or monthly donation. We operate in rural areas where providing unbiased news can be challenging. Read More About Supporting The West Wales Chronicle